Suspension Device for Cable Pole Line (SC-6)

Suspension Device for Cable Pole Line (SC-6)

Suspension Device for Cable Pole Line (SC-6)

SC-6

Galvanized Sheet

Welding

Stainless Steel

GB

Available Sze Available

Accept

JMA

standard carton

IEC

China

8538900000

Product Description

Product show

Suspension clamps
Cable range: 25-95sqmm
Cable: ABC cable 4×25-4x95mm2
Material: Hot dip galvanized steel, rubber, Anti UV plastic
The body is made by aluminium alloy, easy install
Reinforced thermo-plastic UV resistant cover
Delivery Detail: 15-35 days after recieve the deposit
Application: Suspension clamps are designed to anchor insulated overhead lines
On support places, Clamps are made from H. D. G steel and inside is inserted soft insert part, which hold
Cable against move
Product property: On poles, in alignment or angle, different level, also provide for hanging a public light bundle
Technical Data
SUSPENSION CLAMP SHC-1 TO SHC-6 for difference size of cable.
SHC-1: 4*(16-35)MM2
SHC-2: 4*(50-120)MM2
SHC-3: 4*(50-70)MM2
SHC-4: 4*(50-70)MM2
SHC-5: 4*(70-95)MM2
SHC-6: 4*(70-95)MM2

Why Choose Ziyong Technology
1) Professional operation experience
2)Good quality guarantee (2 years)
3)Free sample are available and available for quality test
4) Safe packaging and Prompt delivery
5) All size can be customised
6) Choose our products! You’ll get Professional technology support

Quality guaratee
Strict quality controls have been taken to ensure that you’ll get reliable products. 
A. Material checks before production. 
B. Random inspection during production. 
C. Inspection before the shipment. 

Our products fully comply with well recognized standards such as IEC, BS, ANSI, CE, RoHS

FAQ:
1. Q: Do you have a catalog? Can you send me the catalog to have a check of all your products?
A: Yes, We have product catalog. Please contact us, we’ll send our catalog by E-mail.

2 Q: I can’t find the product on your catalog, can you make this product for me?
A: Our catalog shows most of our products but not all. If you couldn’t find it, let us know the specification of your requirements, it usually takes 20-30 days for us to design and make new moulds which match your requirements.
 
3 Q: What’s your payment term?
A: The price FOB Ningbo under payment term is 50% T/T in advance and the balance before shipment.

Tags: , ,

Contact us

 

 

 

Success! Thanks for Your Request.
Error! Please Try Again.