Silicon Rubber 12.5kn 52kv Pin Post Insulator

Silicon Rubber 12.5kn 52kv Pin Post Insulator

Silicon Rubber 12.5kn 52kv Pin Post Insulator

JMA

CE, ISO9001

High Voltage Power Transmission

Silicon Rubber

High-voltage

Insulator

Insulator for Export

JMA

CNTS/WOODEN CASE

CE, SGS

China

85469000

Product Description

The main technique parameter of Pin Insulator :
1.      all tests are in accordance with IEC61109
2.      maximum RIV is 100µV when tested at 1MHz and10% over nominal line ground voltage for indicated system voltage
3.      all units for 220kv 230kv system voltage should be assembled one corona ring at the line end
4.      all units for 345kv or greater system voltage should be assembled with two corona rings, one at each end.
Feature of pin insulator :
1. Excellent electric corrosion-proof property.
2. High mechanical intension.
3. Light weight and easy installation


Basic 
Data 

Model Type Rated
Voltage
Rated
Mechinical
Load(KV)
Structure
Height H.
(mm)
Insulating
Distance Li.
(mm)
Min Creepage
Distance(mm)
Lighting Impulse
Withstand
Voltage(KV)
P.F Wet Withstand Voltage
(KV)
FPQ-10/4 10 4 215 125 280 75 42
FPQ-10/5 10 5 250 165 420 105 42
FPQ-24/6 24 6 305 255 715 150 75
FPQ-36/8 36 8 440 320 1000 185 95
FPQ-52/12 52 12 480 415 1225 220 110

Service
Choose our products! Youll get
1) Good quality guarantee (2 years)
2) Factory direct prices
3) On time delivery
4) Free sample
5) Professional technology support
 
Strict quality controls have been taken to ensure that youll get reliable products.
a. Material checks before production .
b. Random inspection during production .
c. Inspection before the shipment.

Our products fully comply with well recognized standards such as IEC, BS, ANSI.
FAQ:
1. Q: Do you have a catalog? Can you send me the catalog to have a check of all your products?
A: Yes, We have product catalog. Please contact us, well send our catalog by E-mail.

2 Q: I can’t find the product on your catalog, can you make this product for me?
A: Our catalog shows most of our products but not all. If you couldnt find it, let us know the specification of your requirements, it usually takes 20-30 days for us to design and make new moulds which match your requirements.
 
3 Q: Whats your payment term?
A: The price FOB Ningbo under payment term is 50% T/T in advance and the balance before shipment.
 
 

Tags: , ,

Contact us

 

 

 

Success! Thanks for Your Request.
Error! Please Try Again.