Aluminium-Copper Terminal (DLT series)

Aluminium-Copper Terminal (DLT series)

Aluminium-Copper Terminal (DLT series)

DLT series

Ziyong

VDE, Ce

SCSI

Round

Welding

Terminal

Environmental Protection

Conduct Electricity

Aluminium,Copper

Single Hole Terminals

Without Treatment

Dlt

JMA

as Your Requested

as Your Requested

China

8536909000

Product Description

Cable terminal lug is a kind of accessory for electrical connections, which can be crimped on cable/wire/ electrical equipment without thermal treatment. Our company, Ziyong Technology Co., Ltd, supplies a wide range of premium quality lugs to satisfy different demands. Our products are designed, manufactured and tested as per CE and GB standards to ensure good performance. These products are suitable for the connection of copper conductors (section 1.5mm2-800mm2) with electrical equipments. 

1. Material: Copper-Aluminum, purity≥99.9% 
2.Standard: CE,RoHS,VDE

Drawing:

 

Catalog No. Cable Size (mm2) Dimensions(mm)
d D Φ L
DLT-16 16 5.5 8 13 55
DLT-25 25 6.5 9.5 13 70
DLT-35 35 8 12.5 13 70
DLT-50 50 9.5 14 13 90
DLT-70 70 11 16 13 90
DLT-95 95 12.5 18 13 100
DLT-120 120 14 20 13 105
DLT-150 150 16 22 13 115
DLT-185 185 17 24 17 115
DLT-240 240 20 28 17 140
DLT-300 300 22 31 17 140

Service
Choose our products! You’ll get
1) Good quality guarantee (2 years)
2) Factory direct prices
3) On time delivery
4) Free sample
5) Professional technology support

Strict quality controls have been taken to ensure that you’ll get reliable products.
a. Material checks before production.
b. Random inspection during production.
c. Inspection before the shipment.

Our products fully comply with well recognized standards such as IEC, BS, ANSI.

FAQ: 
1. Q: Do you have a catalog? Can you send me the catalog to have a check of all your products? 
A: Yes, We have product catalog. Please contact us, we’ll send our catalog by E-mail. 

2 Q: I can’t find the product on your catalog, can you make this product for me? 
A: Our catalog shows most of our products but not all. If you couldn’t find it, let us know the specification of your requirements, it usually takes 20-30 days for us to design and make new moulds which match your requirements. 

3 Q: What’s your payment term? 
A: The price FOB Ningbo under payment term is 50% T/T in advance and the balance before shipment. 

Tags: , ,

Contact us

 

 

 

Success! Thanks for Your Request.
Error! Please Try Again.