Copper Earth Rod Clamp for Ground Rod and Cable with Accessories Er70

Copper Earth Rod Clamp for Ground Rod and Cable with Accessories Er70
ER70
Ziyong
Different Kind of Size
CCC, ISO9001, ROHS
TN
Hot Dip Galvanized Steel
Direct Earthing Method
High Voltage Transmission Line
High Voltage
Earthing System
Rod Clamps
Anchor Clamps
Power Fitting
Hose Clamp
Accept
JMA
as Your Requested
ER70
China
7326909000

Product Description

   PRODUCT INTRODUCTION
 
Earth rod clamp is made of Brass, for Ground rod and Ground cable connection. Earth rod clamp is widely used in earthing project with it’s Strong corrosion resistance, Good conductivity, and long use life. 
 

   PRODUCT FEATURES
 

1.Materials Brass, Copper, or Bronze
2. Function: Connecting ground rod to ground cable
3. Advantage: Strong corrosion resistance, Good conductivity, and 50 years use life
4. Operating: Very simple and convenient

 PRODUCT SPECIFICATION

Part No. Application of Ground rod  Application of Cable
38 3/8" 10-35mm2
12 1/2" 10-35mm2
58 5/8" 16-70mm2
34 3/4" 16-95mm2
1 1" 35-120mm2

Product show
 

Why Choose Ziyong Technology
1) Professional operation experience
2)Good quality guarantee (2 years)
3)Free sample are available and available for quality test
4) Safe packaging and Prompt delivery
5) All size can be customised
6) Choose our products! You’ll get Professional technology support

Quality guaratee
Strict quality controls have been taken to ensure that you’ll get reliable products. 
A. Material checks before production. 
B. Random inspection during production. 
C. Inspection before the shipment. 

Our products fully comply with well recognized standards such as IEC, BS, ANSI, CE, RoHS

FAQ:
1. Q: Do you have a catalog? Can you send me the catalog to have a check of all your products?
A: Yes, We have product catalog. Please contact us, we’ll send our catalog by E-mail.

2 Q: I can’t find the product on your catalog, can you make this product for me?
A: Our catalog shows most of our products but not all. If you couldn’t find it, let us know the specification of your requirements, it usually takes 20-30 days for us to design and make new moulds which match your requirements.
 
3 Q: What’s your payment term?
A: The price FOB Ningbo under payment term is 50% T/T in advance and the balance before shipment.

 
 
 
 
 
 
 
 
 
 
 

Tags: , ,

Similar Or Related





Please enter your first and last name separated by a space (e.g. Jane Miller)




Success! Thanks for Your Request.
Error! Please Try Again.